Sign up to receive a text message or email when new bids are added!
Bid Title: Bridge Culvert Construction
Category: Transportation and Utilities
Status: Closed

Description:
Project involves the dismantling, disposal, and salvage of a 6.1 m long precast concrete girder
bridge on a timber substructure, and the supply and installation of 1 – 3.05 m diameter SPCSP
culvert, 32.31 m invert length, 2:1 step bevel ends, 7 km northwest of Glendon, AB. Project
includes granular and non-granular backfill materials, upstream concrete end treatment, Class
1 heavy rock riprap, roadway work, common and borrow excavation, and environmental control
measures. Contractor to supply all materials. Completion date is October 15, 2018.

See the Related Documents section for more information.
Publication Date/Time:
2/21/2018 12:00 AM
Closing Date/Time:
3/21/2018 2:00 PM
Related Documents:

Return To Main Request for Proposals (RFP) Page